Construction of an hydraulic barrier and groundwater treatment plant with related interconnecting system

     
Location   Client
     
San Gavino Monreale - Medio Campidano   Syndial Spa
     
     
     
Description of work    
     

Construction of a hydraulic barrier by drilling and installation of No 32 wells and construction of a groundwater treatment plant and a water extraction system extracting water from the treatment plant itself.

     
     
     
san_gavino_monreale
     
     
     
 Detail of work    
     
  • Planning and construction  of barrier wells and a monitoring piezometer system
  • Construction of a water collection system and a monitoring system
  • Construction of a ground water treatment plant (treatment capacity: 36 m3/ h)
  • Start-up of the plant of the barrier and planning of  their management program
  • Preparation of all documents needed to obtain the necessary authorizations for the plant, the management and discharge of the treated waters.
     
     
     
     

Page loaded in: 0.05
Powered by Simplit CMS