Home » Services » Environmental Services » Site Clean Up and Demolition » Locomotives maintenance workshop Alessandria

Land and groundwater reclamation Alexandria locomotives maintenance workshop

     
Location   Client
     
Alessandria - Alessandria   Trenitalia
     
     
     
Description    
     

Underground storage tanks clean up in accordance with the detailed plan approved by the Municipality of Alexandria.

     
     
     
Trenitalia
     
     
     
 Details of the activities    
     
  • Removal of the supernatant produced by groundwater through the existing well
  • Activation of the hydraulic barrier
  • Groundwater monitoring
  • Management of the water treatment plant and discharge into the sewers
  • Detailed project for excavation face retaining structures
  • Removal of contaminated soil
  • Substitution of diesel fuel tanks and connection to existing plants
  • Management of waste generated from cleaning up activities
  • Drafting of a specific risk analysis.
     
     
     
     

Page loaded in: 0.365
Powered by Simplit CMS